Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Ruqqa begins by checking the floor bed to ensure it does not slope toward the wall. We level the base using shim stones and a spirit level, complete the drain line and seal gaps with strong silicone.
Ruqqa houses have bathrooms with compacted sand floors under thin tiles, and these weak bases cause bathtubs to sag over time. We check the floor with a long straight edge before setting to confirm no slope toward the walls. We remove tiles around the drain opening and place a small concrete pad under the tub's rear heel to carry weight steadily. We run the drain with rigid pipes and tight joints, and test flow with full water volume.
Ruqqa is in Ahmadi governorate and consists of older popular housing where weak floors and simple drainage are typical.
We test each tub with a full fill, hold water for a full hour, then check under the tub for any slow seepage.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, in most cases. We remove tiles and pour a five-centimetre concrete layer under the entire tub footprint. This spreads the weight of water and body over a wider area and prevents settlement.
Usually a full day because we inspect the floor first and fill voids with concrete before setting the tub. If we need to remove old tiles it can take two days.