Site and drain check
Measure the bay and confirm drain fall before moving the unit

Ahmadi
A jacuzzi in Ruqqa begins with assessing the existing bathroom and verifying the waste line is adequate. We secure the tub on a strong base, install the jet pump, connect hot and cold supplies and run a full pressure test.
Ruqqa residential houses near the Ahmadi industrial zone usually have ground-floor bathrooms with drain openings near walls. The floor is often tile laid over sand and gravel, meaning a full jacuzzi weight may shift slightly over time. We assess floor stability and set a concrete bed under the tub feet to spread the load, then connect the waste to a downward-sloping run toward the nearest trap.
Ruqqa is a residential area in Ahmadi governorate where houses combine moderate density with basic drainage systems.
We test the waste line fall using a water level to ensure drainage flows toward the trap without pooling.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually we lay a concrete bed under the tub feet to anchor it on a stable surface. If the floor is unlevel we raise the sand layer under the tiles to level the surface before installation.
We measure the distance first and calculate available fall. If too far we cut a run under the tiles or install a raised wall pipe with a small waste pump to empty the tub.