Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Shadadiya requires thorough inspection of old drainage under the floor and rebuilding the base with modern cement. We carefully remove the old tub, secure the new one with flexible silicone and test it under full water pressure.
Shadadiya houses were built in different periods and some main bathrooms have old-style floors. The floor trap may be deep or shallow depending on house age, and the slope from tub to trap may be uneven. We use a precise laser level to measure gradient and build a new cement base to correct any subsidence.
Shadadiya sits in Farwaniya governorate in the outer suburbs where old and new houses are mixed.
The tub is filled to capacity and left for one hour before final drainage to check for seepage around the feet.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we build a new high-quality cement base under all four feet with adequate rise. We measure the subsidence then add cement in stages to reach the required level.
We test it first by running full water flow from the tub to check capacity. If blocked, we flush it under high pressure or open a new waste line from trap to outside.
