Drain and supply check
Outlet position and height confirmed before the unit is placed

Hawalli
Replacing an old enamelled steel bath is a frequent bathtub installation job in Shuhada, and owners usually want to keep their wall tiles. We cut the old tub out carefully, fit a new one of matching size, and close the joint so the tile line above stays intact.
Older steel tubs in Shuhada bathrooms are usually set into the wall under the first row of tiles, which makes removal delicate. We score the grout above the rim, cut the old tub into sections so it lifts out without levering against the wall, and check the old waste for scale before reusing its position. A new acrylic tub of the same footprint slides back under the tile line, and a matching trim covers any small gap left behind.
Shuhada is a residential district in Hawalli governorate whose family houses often still carry their original bathroom fittings.
When replacing a steel tub in Shuhada, we cut it into sections so it never levers against the tiles.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually, if the new tub has the same footprint. The old one is cut out in sections and the new one slides under the existing tile line.
Acrylic is lighter, holds heat longer and does not chip to bare metal. It also makes carrying and positioning easier in a finished room.
