Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Shuwaikh starts with checking the existing floor drain outlet and its fall toward the main stack. We set the tub perfectly level on a concrete or timber base, connect the waste and supply, then pressure-test under full flow.
Most older residential flats in Shuwaikh have a narrow main bathroom with an old buried drain pipe under the floor, which determines how the new tub connects. We open the floor around the existing outlet, check the fall and diameter, and position the tub so its waste outlet sits above the collection point. If the old pipe is narrow or partially blocked, we run a new drain line within a raised floor after removing the mosaic.
Shuwaikh sits on the northern coast of Kuwait City near Shuwaikh Port and beside Kuwait Science Museum, a mixed district of flats and small workshops built in the seventies and eighties.
Every tub is tested under full water pressure for one minute before the floor is closed because fixing a leak later requires extensive breaking out.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the existing drain has sufficient fall, yes. We open the floor minimally around the existing outlet, set the tub level on a slim base, and fill the gap with reinforced grout.
We test the drain first with test water. If it is blocked we offer cleaning it or running a new drain in a raised floor system. The second option preserves a safe fall over the existing slab.
