Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Bathtub installation in Surra begins by inspecting the villa bathroom drain, which typically connects to a main line under the street. We set the tub level on a concrete base, connect waste and supply with copper pipe, and pressure-test before handover.
Luxury Surra villas have spacious main bathrooms with marble or mosaic floors and drains running through thick concrete walls beneath the floor. When installing a new tub we locate the existing drain and inspect its path from bathroom to collection point. If the tub sits far from the old drain we run a new copper line within the floor and fill the gap with high-strength cement. Every villa has an external test point on the garden, and this is where we pressure-test the complete drain circuit with water.
Surra is located in Kuwait governorate near Surra Co-op and Fourth Ring Road, a prestige villa district with spacious gardens.
Every joint in a Surra drain line is tested at 4 bar for twenty minutes because Surra villas demand flawless drainage.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, if the new drain run is very long we must slightly raise the floor or use a raised base to ensure continuous fall. Opening marble or mosaic floors is done carefully to avoid breakage and maintain matching.
We test it first under high pressure from the external test point. If blocked we offer cleaning it with a jetting machine or running a new pipe tapped to it. The second option is better if the old drain is too narrow.
