Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in West Abdullah Mubarak begins by removing any old unit and clearing the floor, then inspecting the drain and supply line. We set the new tub and level it precisely on a solid base, create proper water connections and seal all joints. Pressure testing comes last to verify no leaks before final handover.
Many West Abdullah Mubarak homes have medium-sized bathrooms with sometimes aging drain pipes, so we inspect fall and diameter before fitting a new tub. If the existing pipes are narrow or clogged with deposits we suggest rerouting the waste through new pipe. The tub itself sits on rubber isolators to dampen vibration and noise, especially where floors are timber or old construction.
West Abdullah Mubarak is in Farwaniya governorate, a residential suburb of villas with multiple bathrooms and older family homes.
We check existing pipe diameter with a thickness gauge before approving an old waste route.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect old pipes carefully for deposits and cracks using a sonic probe. If they are clear and have proper fall we can reuse them, otherwise we run new pipes beneath the floor.
The silicone we use needs at least eight hours to set fully, and we advise against filling the tub for twenty-four hours. This ensures the sealant has reached full strength and will not pull away when the tub is filled.
