Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Ardhiya Industrial starts with checking the floor and existing drainage in factory and workshop areas. We verify drain slope, position the unit level and run a full-pressure leak test before final handover.
Most industrial buildings in Ardhiya have thick concrete floors and deep floor traps designed for heavy workshop and machinery drainage. A bathtub here must sit level without blocking work flow and maintain a steady fall to the existing trap. We pressure-test pipes thoroughly because heavy concrete floors can settle slowly, affecting drainage over time.
Ardhiya Industrial is in Farwaniya governorate, a dense zone of warehouses and factories where a bathtub is a practical work tool rather than a fixture alone.
We finish by running full flow for five minutes to ensure no seepage under the concrete floor.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If we set the bathtub on a proper base of tamped sand and gravel, it will stay stable. We check the slope monthly in year one because slow settlement affects drainage before you see it.
We run a new waste pipe from the bathtub to the trap, keeping at least one in a hundred slope per meter. If the distance is too great, we suggest moving the bathtub closer to the existing trap.
