Site and drain check
Measure the bay and confirm drain fall before moving the unit

Hawalli
In Siddiq, installing a jacuzzi in residential villas starts with measuring the bathroom and mapping existing pipe routes. We choose a safe location that avoids electrical outlets, run hot and cold lines from the plant room, and connect the jet pump with a main feed under the floor before testing.
Siddiq villas stand on solid foundations with bathrooms divided by bearing walls, allowing supply and waste lines to pass inside walls without extra cutting. We open the main distribution chamber and tap hot water from the existing water heater, running waste to the nearest floor trap with steady fall. All joints are secured with fixed pipe wrenches and protective covers against leaks and vibration.
Siddiq lies in Hawalli, a dense residential district of family villas with advanced concrete foundations.
We cap all side jet outlets with pressure-test plugs before running the first pump cycle.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the existing heater has enough capacity and holds steady at 45°C. We branch from the main hot line and install a mixing valve to control jacuzzi water temperature precisely.
Yes, constant vibration loosens metal joints quickly. We mount the pump on a rubber isolation base and use flexible hoses one metre long from the supply lines. We test every joint under full flow for ten minutes.
