Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Farwaniya
Sanitary fixture installation in Ruqai requires precise understanding of floor layouts in single-family homes. We measure each sink distance from the nearest floor trap and run the waste with steady fall away from the foundations. Leak and pressure tests are done before handover.
Ruqai houses are relatively older with shallow concrete foundations, which limits the depth of floor traps. This means bathrooms and kitchens must sit close to the main drain or waste pipes run above the floor. We choose a route that avoids existing foundations and does not breach load-bearing walls. Where needed we install a subsurface catch basin with a pump to lift waste when the floor trap is too deep.
Ruqai sits in Farwaniya governorate, a heritage residential area marked by older villas with simple designs and shallow foundations.
Every waste joint is tested by filling the pipes with water then opening the valve suddenly to check drainage speed.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the new room sits closer to the floor trap or main line. We draw the new waste route on the floor first and verify sufficient fall, and if it is too far we install a greywater pump.
Supply pipes carry clean water under high pressure in small diameters, while waste pipes carry used water unpressurised and need adequate fall. Supply pipes are copper or plastic; waste pipes are cast iron or rigid plastic.
