Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Farwaniya
Water tank installation in Ruqai requires calculating the pressure needed to lift water from an underground tank to the roof if one exists. We choose the pump based on height and floor count, then install suction and discharge lines at the right diameters and test the flow.
Many Ruqai houses have an old underground tank for collection and a basic or damaged rooftop tank. We remove the old roof tank and install a new one with an inlet pipe from the pump sized to the house demand. The suction line from the underground tank needs a strainer at the opening to keep silt from entering the pump. After installation we run the pump for at least an hour to confirm steady pressure and no leaks at the joints.
Ruqai is in Farwaniya governorate, a relatively older residential area where most houses depend on an underground tank and pump system to lift water.
The pump is tested under full load before handover because low pressure can signal a fault that may not show until days later.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We check it first by running it under no load and measuring pressure and flow. If it shows low pressure or strange noise we recommend replacing it before installing the new tank.
Yes but it needs a strong support structure of steel or concrete. We calculate the total weight of the tank and water, then agree with the builder on the structure before lifting.
