Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Hawalli
Proper fixture installation in Salwa requires knowing the exact pipe layout under marble floors. We position each fixture based on line length and available drain fall. We secure brackets firmly and test every flow and pressure before we leave. Sealing uses metal ferrules and white compound that resists discoloration.
Apartment blocks near Salwa Co-op have identical bathrooms, each draining to a shared vertical stack. We check first whether the stack is open or blocked by debris, and clean it if needed. Then we connect the basin, toilet and shower outlets at right angles on the same level before rising to the stack. Hot water comes from a small individual heater, so we make sure insulated pipes do not transfer heat to the wall.
Salwa sits in Hawalli governorate near Mishref Park, a seven-storey apartment block residential zone.
We test the vertical stack with high water flow from one floor at a time because sewer gases build up easily in residential towers.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, because the stack is shared by all units. We contact management first and run clearing equipment gently to avoid pushing the blockage down and stopping drainage completely.
Yes, because heat transfers to shared walls and bothers neighbours. We use 13 mm foam insulation on every hot pipe and check external wall temperature after finishing.
