Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Capital
Fixture installation in Sawaber focuses on multi-storey residential towers with vertical pipes fixed during construction. We choose a location near the main waste stack in the wall. We run supply and waste over short distances through interior walls and test them before completion.
Sawaber residential towers use a central distribution system where supply and waste pipes usually run together in a bearing wall often at the flat's centre. This makes our work easier because any new fixture can sit close to this wall without major extra cost. We scan the wall with a metal detector to precisely locate existing pipes then open carefully. If a resident wants a fixture far from the central wall we need long distribution lines under the floor, which requires coordination with building management to avoid disturbing neighbours below.
Sawaber sits downtown Kuwait city near Al Sawaber Complex, a district of dense modern residential towers.
We fill any gap around new pipes with sound-damping insulation to reduce water flow noise inside shared walls between flats.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If we run pipes under the floor neighbours below may hear water flow when new taps open. We use rubber clips and sound insulation to minimise this noise as much as possible before starting work.
Yes, if the second bathroom sits near the central wall where pipes run. If it is far away we need long lines under the floor and may need a small waste pump if floor gradient is not steep enough.
