Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tanks in Sawaber supply high-density residential towers holding dozens of units. We calculate total water demand, select large or dual tanks with strong central pumps distributing water evenly.
Sawaber residential complexes have high occupancy density with shared roofs between towers. Near Al Sawaber Complex we install large tanks on unified steel frames serving multiple buildings from one distribution point. We fit water meters on each branch line to monitor use and run pumps under full pressure for two hours.
Sawaber sits in Kuwait governorate, an urban residential district where adjacent towers share water services.
Flow rate is measured at each isolation valve because multiple towers need pressure balance across all branches.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if towers are close and the roof can fit a strong frame. We fit isolation valves on each branch so one tower's supply can be cut without affecting others.
We install a central pump with pressure set to four to five bars. We also raise a small secondary tank on the roof to act as a buffer, keeping pressure steady when the pump stops.
