Frame and tray level
Frame and tray set perfectly flat so water drains fully

Mubarak Al-Kabeer
Fitting a shower cabin in Abu Fatira requires checking the floor base for old moisture beneath it. We set the frame level, connect the waste to the floor trap, seal all openings with waterproofing and test full flow.
Ground-floor houses in Abu Fatira often stand on old foundations with trapped moisture in the floor slab beneath tiles. Before fitting the cabin we inspect the entire floor for seepage signs from below and open the old drain run to check it. Where we find damp, we lay a damp-proof layer before pouring a fresh concrete bed with sand and cement, which stops the new cabin causing later floor cracking.
Abu Fatira is a residential area in Mubarak Al-Kabeer where most houses are older builds and need special care when upgrading.
Cabin drainage is tested with full-volume water for ten minutes while we watch the surrounding floor for any leaks.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We lift tiles in the cabin area, inspect the base and old drain, and remove damp by ventilation or a new damp-proof layer. Then we pour fresh concrete before setting the cabin.
Only if the floor is completely dry and slope already exists toward the trap. We measure and clean it first, and if it is damp or flat, floor work is essential.
