Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Mubarak Al-Kabeer
A wall-hung toilet in Abu Fatira starts with checking wall thickness and existing pipe routes before drilling frame holes. We run supply and waste, position the cistern and run full pressure to verify all joints.
Abu Fatira homes are residential villas where internal walls may be thin in secondary bathrooms. We measure wall depth before choosing the frame, because a strong frame needs enough thickness for proper anchorage. Waste lines connect to ground-floor pipes or the central collection tank in the courtyard.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a residential villa area where multiple bathrooms need safe, reliable drainage.
Before handover we flush all drilling debris from waste pipes then test them with warm water to verify flow.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the wall is too thin, we use a lighter frame or suggest a floor-mounted toilet instead. We measure first and choose the safe option.
We run the waste pipe behind the wall or under tiles to the nearest trap in the bathroom or to the main drain line. We test the fall and flow before resetting tiles.
