Frame and tray level
Frame and tray set perfectly flat so water drains fully

Mubarak Al-Kabeer
Shower cabin fitting in Mesila starts by checking the bathroom floor slope toward the floor trap location. We set the frame level, run waste pipe at steady fall and seal every opening before testing running water at full pressure.
Mesila is near hotels and resorts, so newer villas and luxury apartments with large bathrooms and quality fittings are common here. Floors are usually high-grade marble or ceramic with natural slope to properly made floor traps. This means cabin fitting is straightforward, and we focus on tight sealing and thorough testing to stop water penetrating any tiny gaps that could damage surrounding walls.
Mesila sits in Mubarak Al-Kabeer near the beach and Mesila Beach Hotel and Green Island area.
Every joint between frame and floor is checked with a damp brush before final sealing to confirm the surface is completely clean.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use seals and metals specifically resistant to salt and damp in coastal areas. We also advise you to ventilate the bathroom well and dry edges after each use.
Yes, but the heating system must be fitted before concrete and tile are laid. We coordinate with the heating technician to avoid cutting heating pipes when installing the cabin waste.
