Waste outlet check
Height and position confirmed before the shower tray is set.

Mubarak Al-Kabeer
A shower in Mesila faces unique challenges because the area is near the sea and roof tanks may be affected by severe moisture. Water quality and pressure are tested and a salt-resistant tray design is chosen. Every edge is sealed with marine-grade waterproofing and drainage is tested under full pressure before handover.
Hotels and resorts in Mesila have central drain systems and large roof tanks, meaning high water pressure and swift drainage from upper floors. Water inlet pressure is tested before shower installation because high pressure may cause leaks at the tray or joints. Stainless steel fittings are chosen and a thick waterproofing layer is applied under the tray to protect the structure from salt and moisture.
Mesila sits in Mubarak Al-Kabeer governorate near Mesila Beach Hotel and Green Island.
Inlet water pressure is measured and the shower is not installed if pressure exceeds 4 bar because fittings will leak.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Stainless steel and nickel-plated brass resist salt and moisture better than other materials. Iron and zinc are avoided because they rust quickly in marine conditions.
Yes, we install a pressure regulator on the inlet if pressure exceeds 3 bar. This protects fittings and the tray and cuts water use without affecting user comfort.
