Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Hawalli
Wall-hung toilet installation in Salwa begins by checking the rear wall and its concrete frame strength before fixing the mounting frame. We run supply and waste from below, adjust the bowl height to preference and perform full pressure testing before handover.
Most Salwa apartments have very tight bathrooms, and a wall-hung toilet frees up floor space and makes cleaning simple. The frame ties into the horizontal floor waste already behind the wall, and where that waste is a bit high we run the pipe up inside the wall then back down to the pan. Every supply pressure joint is tested for leaks before the flush cistern is fitted.
Salwa is in Hawalli governorate, a dense residential zone where small flats are the standard housing type.
Before handing over, the supply line runs at full pressure for ten minutes to check every joint and seal.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the concrete depth behind the tiles and check the spacing of the reinforcement bars first. If walls are weak we fit a lighter frame with fasteners spread across multiple points for load distribution.
Yes, the frame allows raising the pan from 35 to 42 centimetres as needed. We adjust the rise pipe height and test waste flow at full rate to ensure no blockage risk.
