Waste outlet check
Height and position confirmed before the shower tray is set.

Ahmadi
Dabaiya shower installation starts by running cold water from the main tank and draining it through level sandy ground. We choose a spot away from pooling zones, build a stable base, secure pipes firmly and test flow and integrity before handover.
Dabaiya is a low-lying southern area with dispersed buildings on clay-sand ground that gets damp fast after rain. Showers need quick drainage to stop water pooling around the base and walls. We build a pad slightly raised above ground level, lay waste pipes on clear slopes toward a distant sump. The pipes themselves need heat protection in summer, so we cover them with a sand layer after installation.
Dabaiya sits in southern Ahmadi governorate, a low-lying zone where natural drainage is very slow.
We test shower drainage by running water for an extended period because clay-sand soil needs time to absorb flow.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, very damp soil can cause concrete pads to shift over time. We raise the pad slightly, build a gravel layer underneath for fast drainage and re-check all bolts after one month of use.
We cover them with dry sand after installation to buffer temperature swings around the pipes. We use heat-resistant tubing and leave it slightly loose to allow for thermal expansion.
