Waste outlet check
Height and position confirmed before the shower tray is set.

Ahmadi
Shower installation in Shuaiba Industrial begins by checking the high water pressure that petrochemical facilities feed to this zone. We measure the pressure and fit a regulator if needed, then mount the shower head securely to the tiled wall and test flow and drainage before handover.
Most bathrooms in maintenance centres and office buildings at Shuaiba Industrial are built with high humidity and walls with no cavity behind them. We drill carefully using long anchor bolts that penetrate tile into concrete. Hot water lines are usually near the boiler house, while cold pipes need longer runs beneath the floor toward the central tank.
Shuaiba Industrial lies in Ahmadi governorate, a zone focused on refining and petrochemicals where showers equip both industrial washrooms and technical office facilities.
Water pressure at the shower head is tested after mounting because excess pressure causes joint leaks over time.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Copper pipes and a heavy-gauge metal shower head withstand high pressure, but we fit a pressure regulator if it exceeds three bar. This protects joints and the spray outlet from leaks and wear.
Yes, we drill the concrete with a percussion drill and fit chemical expansion anchors. But if tile is added later it must reach behind the shower to protect the wall from moisture.
