Waste outlet check
Height and position confirmed before the shower tray is set.

Ahmadi
A shower in Dhaher relies on getting cold water from the tank and managing drainage through sandy ground. We pour a small concrete pad, secure the bracket firmly, run the lines and test every joint before closing the walls.
The Dhaher area is remote desert with buildings on sandy ground that needs solid foundations under showers. Water arrives from an elevated tank but pressure fluctuates with site use, and drainage must run far from low spots to prevent pooling. We lay waste pipes on long slopes to a distant dry well, and cover the area with fresh sand after work to stop erosion around the base.
Dhaher sits in Ahmadi governorate near the Saudi border, an oil exploration zone with limited resident staff.
Overhead tanks at Dhaher sit at varied heights so we measure actual pressure before choosing the shower head.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Wet sand compacts but needs long drainage runs. We build a concrete pad with perimeter drainage and run waste pipes on steady slope to a dry well.
At least twice: once at full flow to check for leaks, and once running fifteen minutes to monitor drainage and performance. We inspect every joint and bracket.
