Waste outlet check
Height and position confirmed before the shower tray is set.

Capital
Shower installation in Qibla usually begins with removing old angled or dripping heads. We level the wall precisely, run hot and cold lines with correct fall and secure the new head so water drains at a straight angle to the trap without pooling.
Many apartments and shops in Qibla near the commercial zone were built decades ago, with cramped bathrooms and sloped old floors. We check the existing waste pipe fall before choosing the head height, sometimes raising the head above standard to reach the floor strainer. Where the floor is nearly level, we use flexible sealing to close the gap between the body and wall.
Qibla lies between Gulf Road and Twelfth Street, a mixed zone of shops and older residential flats where shower installation requires fall correction and solid sealing.
We test the head mounting and all joints under full water flow for one minute before handover to ensure no leaks at any connection.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the old pipe has enough fall, yes, but we check its diameter first. Narrow old pipes may reduce flow or leak when the new head is connected, so replacement or reinforcement may be needed.
We use a flexible gasket and moisture-resistant sealant that withstands heat and humidity. It is applied to all gaps around the body and head and left to cure fully before water is run.
