Position and height
correct mounting height marked before any fixing begins

Capital
Washbasin installation in Qibla starts by checking the bearing wall and distance from main supply lines. We choose the mounting position, run hot and cold lines from nearby distribution, connect waste to the nearest trap and pressure-test everything before handover.
In commercial and residential buildings in Qibla near Gulf Road, main supply pipes usually run in back walls or sit at a known depth underground. We measure the distance from the cold and hot water lines to the basin position, and for longer runs we choose copper or plastic pipes based on expected pressure. Waste must fall steadily to the floor trap, and where necessary we raise the basin slightly to improve the gradient.
Qibla is a mixed commercial and residential district in Kuwait governorate near Seif Palace and the Commercial Bank of Kuwait, where uses are mixed.
Before handover, we run the supply and waste lines together under full system pressure to check for leaks at every fitting.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but longer runs need horizontal supports every metre and lose extra pressure. We calculate the expected load and choose the right pipe diameter before running it under tiles or behind the wall.
Each joint is flushed under full flow for one minute during final testing, then left to dry and visually checked. If a small leak appears we undo the fitting, clean it, dry it thoroughly and reseal it.
