Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Ahmadi
Sanitary fixture installation at Shuaiba Industrial usually starts by assessing existing supply and waste routes in the petrochemical complex. We run copper and plastic pipework to plan and fall, fit each fixture and pressure-test every joint before commissioning.
Shuaiba Industrial facilities contain workshops and wash areas with floor waste lines and roof-mounted tanks for cold and hot water. Fixtures here experience constant pressure and greater heat loss than residential, so we size pipes larger and fit strainers at supply inlets to protect basins from sediment. Concrete floors provide strong support for heavy metal basin pedestals.
Shuaiba Industrial sits in Ahmadi governorate near the KIPIC petrochemical complex, where all fixtures depend on precise pressure and flow maintenance.
Every threaded joint is air-tested before water supply because one leak can halt production.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
At Shuaiba we use heat-rated plastic up to 65°C, but for lines closer to the hot source we prefer copper. Copper conducts heat quickly and withstands sustained high pressure.
We fit a 100-micron strainer at the main supply head before water splits to basins and taps. The strainer is inspected monthly and replaced when the mesh clogs.
