Wall position check
Marking the correct height and anchor points before any drilling

Ahmadi
Wall-hung basin installation in Jaber Al-Ali requires checking wall strength for anchorage because some older homes here have thinner brick or block walls. We select the position based on existing pipes, secure the brackets safely and test every connection before handing over.
Jaber Al-Ali homes are a mix of older houses with block walls and newer ones with concrete, which affects how the basin is anchored. In older homes we use heavy-duty nylon anchors that spread the load wider, in newer homes we use metal screws directly into concrete. We always assess wall thickness and material before choosing the anchor type.
Jaber Al-Ali is located in Ahmadi governorate, a mixed residential area with both older and newer housing stock.
We check wall thickness with a meter before selecting the right anchor and screw type for the material.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we use heavy nylon anchors instead of metal screws because block is less dense than concrete. We spread the load across several anchors so the block does not crack around one point.
We run new pipes from the supply point, either inside the wall or surface-mounted depending on construction. If the distance is large we may need to open part of the wall or use concealed external pipes routed behind the basin.
