Wall position check
Marking the correct height and anchor points before any drilling

Jahra
A wall-hung basin in Jahra Industrial provides reliable break-room and washing facilities for workers in large factories and warehouses. We select a strong concrete wall, run pipes from the main network and connect waste to the facility system. Complete testing confirms safe performance.
Jahra Industrial factories have very heavy construction with extremely thick concrete walls, large central water branch lines and tight underground drainage. The wall-hung basin fixes completely solid to very strong walls. Copper pipes branch readily from main distribution lines and the floor's slight natural slope lets waste drain toward the sump without problems.
Jahra Industrial lies in Jahra governorate, a specialist zone focused on large-scale factories and warehouse clustering.
We run the basin at full flow and monitor drainage for ten continuous minutes to ensure water does not pool anywhere.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we first test the main distribution line pressure then branch with new copper of appropriate size for one basin. This protects the basin from sudden pressure spikes.
Yes, industrial drainage systems are very tight and have large capacity. We test flow rates and falls then connect the new waste readily to existing collection lines without adding strain to the system.
