Drain and supply check
Outlet position and height confirmed before the unit is placed

Jahra
Bathtub installation in Jahra Industrial serves large factories and workshops. We check the existing drain and the factory's hydraulic system, set the tub on a flat concrete base, connect waste and supply, seal joints and test under high industrial pressure.
Jahra Industrial factories have wide level floors and strong central drain systems. The tub may serve a workshop or worker hygiene area. Existing drains carry high flow from factory processes, so we ensure the tub waste does not pressure the main lines. We test compatibility between factory pressure and tub pressure, and connect lines with flexible joints that absorb vibration from nearby machinery.
Jahra Industrial sits in Jahra governorate and holds a dedicated zone for heavy factories and workshops.
Each tub is tested at pressure exceeding the main factory system pressure to ensure joints do not fail under high load.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we install a mesh strainer in the waste line to prevent hair and debris entering the main pipes. The filter is tested every three months and cleaned per maintenance guidelines.
It may cause joint cracks over time. We use rubber pads under the tub legs and flexible pipes on all connections to absorb vibration. We check joints one month after the facility starts running.
