Wall position check
Marking the correct height and anchor points before any drilling

Ahmadi
Installing a wall-hung basin in Julaiaa starts with checking the wall and locating the water line from the overhead tank. We position the basin height on a solid wall, connect hot and cold lines and run waste with the right slope.
Julaiaa is a southern desert zone with family houses and low-rise buildings with roof tanks. The wall-hung basin usually goes in a utility bathroom or kitchen entrance near main water lines. We check wall condition, test fixing strength and ensure drain pipes avoid furniture and moisture problems.
Julaiaa sits in south Ahmadi governorate, a desert residential zone where homes rely on roof tanks for water.
Before handover we measure basin drainage with a standard gauge to ensure water does not pool in the waste line.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, a steady slope of three to four centimetres per metre is enough for proper drainage. If the wall is too high we use a raised outlet on the basin to avoid steep falls under the floor.
Yes, if the main drain line is sound and slopes evenly. We connect the basin at a side entry point on the main line rather than the end so water does not pool.
