Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Kaifan usually happens in modern apartment bathrooms with thick concrete walls. We mark the fixing position on the main load-bearing wall, run the pipework and test every joint before finishing.
New Kaifan flats near the sports club have narrow bathrooms and strong concrete walls perfectly suited to wall-hung basins. Concrete walls bear the weight of the basin and user safely if we fix it correctly. We locate the centre of the load-bearing wall and test depth with a small pilot drill before full bore-holes. Water and waste pipes run inside the wall where possible, but in some flats the old horizontal drain line is visible and we connect directly to it.
Kaifan sits in Kuwait governorate near Kuwait Sporting Club, a district of modern apartment buildings with regular layout.
After fixing, the basin is filled with water and the drain left open to inspect for leaks from upper joints and waste connections.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In thick concrete walls we do not usually need extra reinforcement. We use tempered steel anchor bolts sized 10 or larger with heavy metal washers that distribute the load.
We cut a small opening in the wall at an angle downward and run the waste pipe to the trap with a steady slope. If the trap is very shallow we raise the basin outlet to provide better fall.
