Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Qortuba starts by checking the bathroom wall and picking a comfortable height above floor level. We locate existing pipes behind the tile, mark mounting holes precisely before drilling and fix the bracket securely into the timber frame. Hot and cold supply lines are run and all connections tested under pressure before handover.
Qortuba villas are mostly two or three storeys with multiple bathrooms, many renovated recently with modern pipes embedded in walls. This means we can usually connect the wall-hung basin to existing supply points without opening new tile or marble runs. For older builds we scan walls with a detector and trace pipe routes before drilling. Waste needs strong fall towards a nearby floor trap, and where distance is an issue we plan an underfloor connection that keeps the bathroom clean-looking.
Qortuba is in Kuwait governorate, an upscale villa district where wall-hung basin installation suits the contemporary bathrooms in spacious family homes.
Every metal joint between supply lines and the faucet outlet is checked under water pressure before we leave.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In most cases no, because the bracket needs a different height and old pipes may block the new run. We remove the old basin first, then position the bracket based on comfortable height and available supply pipework.
We use a heavy-duty rotary drill with a carbide bit and clear dust from the hole before fitting anchors. Where there is no timber frame behind the concrete, we use expansion anchors that grip the surrounding wall.
