Wall position check
Marking the correct height and anchor points before any drilling

Capital
Installing a wall-hung basin in Kuwait City starts by checking the load-bearing wall and marking bracket positions with precision to support the weight. We run hot and cold supply from nearby pipes, connect the waste and test every joint under full pressure.
The towers and tall buildings near Liberation Square contain small flats and cramped bathrooms, where walls are a mix of block and brick that need testing before bracket fixing. We use steel fasteners 10 centimetres long and drill deep into the mortar courses to spread the load. Vertical pipes often run behind the outer wall, so we trace them with a detector before drilling to avoid breaking them.
Kuwait City is the capital, where residential flats and offices cluster in tall buildings with standard bathrooms.
We test bracket mounting by hanging a 20-kilogram weight on the edge before fitting the basin because pipes and water add extra load.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We scan it first with a detector to check its thickness and composition. If it is a load-bearing wall we can use long brackets, but if it is only thin external cladding we suggest an interior wall instead.
We use a metal detector to locate existing pipes and drill clear of them. If space is very tight we run new pipes together in a bundle to save space.
