Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Sharq begins by checking the bathroom wall to find a fixing point clear of hidden pipes. We set the basin height to suit household users, then drill and seat the brackets deep into the concrete frame. Supply and waste connect and every joint is checked for leaks before completion.
Sharq buildings date back several decades with solid walls, and some bathrooms have vertical water distribution pipes hidden inside. We use a stud finder before drilling to avoid hitting a live supply riser. Ground levels in these older blocks sit slightly above street level, meaning floor traps are usually deep, giving the basin waste line good slope. We test wall soundness by tapping before any hole is made.
Sharq is in Kuwait governorate near Kuwait Towers and Sharq Marina, a long-established commercial and residential zone.
Before drilling, wall thickness is measured with a sensor because older walls contain reinforcement steel at unpredictable depths.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we must test the wall and check for pipes and steel before any drilling starts. We use special fasteners rated for older concrete that grip firmly regardless of the surface condition.
A long line without sufficient slope will slow drainage and cause blockage. We calculate distance and slope before installation, and if it is too far we suggest moving the basin closer to the trap.
