Wall position check
Marking the correct height and anchor points before any drilling

Hawalli
Wall-hung basin installation in the Ministries Area starts by checking office and corridor walls to find a safe spot away from existing electrical lines and pipes. We set the basin height for the user, anchor bolts into concrete, run supply and waste lines and pressure-test everything before handover.
Government buildings around the Ministries Complex have thick concrete walls and central piping running through main columns. When fitting the basin we avoid these runs and find a clear wall section strong enough for a secure bracket. Waste usually drops inside the wall towards the main drain network below, so we trace existing connection points before drilling.
The Ministries Area lies in Hawalli, an administrative zone where government offices and public services need wall-hung basins that can be cleaned quickly.
We load-test every bracket horizontally before the basin goes on because concrete walls require stronger anchorage than standard partitions.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use chemical expansion bolts in solid concrete and allow full curing time before mounting the bracket. Then we push hard on the basin before handover to verify there is no movement at all.
Supply lines can run inside the wall if space exists, but waste needs a steady fall so in thick walls we sometimes run it on the surface behind the basin. We scan first to avoid hitting existing pipes.
