Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Hawalli
Western toilet installation in Ministries Area starts by measuring the floor level and ensuring it is flat before anchoring the pan base. We run the cold supply to the cistern, connect the waste to the roof or floor stack and test the seal for any seepage.
Government buildings near the Ministries Complex are often multistorey with pipes embedded in thick concrete walls. The toilet usually sits in a narrow cubicle with a vertical waste stack running inside the wall, so we need precise measurement of direction and height before drilling. If existing pipes are old we may find scale blocking the outlet, so we clear them and confirm free flow before connecting the new pan.
Ministries Area sits in Hawalli governorate and houses official government buildings, which means toilet installations must be done precisely and without disruption to administrative work.
We test every joint with direct water flow and check for leaks under the pan base and around the waste because reopening the floor slab is costly.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we clean the pipes first and test water flow. If the pipes are too narrow we run a new waste line from the cistern directly to the nearest vertical stack.
Usually two to three hours depending on existing pipe condition. We measure, install, and test the seal under full flow to ensure no leakage.
