Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Mubarakiya Camps handles old commercial and residential buildings with pipes in place for decades. We inspect the site first to confirm wall strength and clear the area from electrical wires and main lines. We mount brackets securely to the wall then connect supply and waste with extra care. We test every joint under full pressure before leaving.
Old shops, offices and flats near Mubarakiya market have thick brick and concrete walls, but old pipes inside are completely buried under tiles and paint. Before mounting brackets we use a metal detector to check the position of waste and supply pipes beneath the surface. If we find main lines nearby we choose another basin spot. Load-bearing walls give high confidence in the final installation stability.
Mubarakiya Camps sits near Mubarakiya market in downtown Kuwait City and contains shops, craftspeople and long-standing residents.
We scan old walls with a metal detector before drilling to avoid damaging existing pipes or wires.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Thick brick and concrete walls are very strong and heavy brackets hold firmly. We select long, high-grade bolts for each wall type and test them with strong pull before mounting the basin.
We use a metal detector to locate the path and mark the wall before any drilling. If supply pipes are far from the desired spot we run new lines on the surface or in wall channels.
