Wall position check
Marking the correct height and anchor points before any drilling

Capital
Wall-hung basin installation in Dasma starts by finding a load-bearing wall that can take both the basin weight and the waste line. We trace existing pipes behind the tiles and pick a height that works for all users in the bathroom. We run hot and cold supply from the nearest feed point and connect the waste to the floor trap or horizontal stack. Every joint is pressure-tested before handover.
Old Dasma houses have small guest bathrooms on the ground floor, sometimes with old pipework running through the walls. Before fitting we check the wall thickness with a gauge and avoid pipes running near the surface. A wall-hung basin takes up less floor space than a pedestal, which matters in compact bathrooms. We choose a steel carrier frame with heavy bolts that handle dynamic weight during use. We load-test the bracket at five times the expected weight before securing the basin.
Dasma sits in Kuwait governorate near the city centre, an older residential area where bathrooms are compact and walls are sometimes thin.
We test every joint under running water for ten minutes because old walls may have fine cracks hidden behind tiles.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we must first measure wall thickness and test strength with a pilot bolt. If the wall is thin we use a carrier with long fasteners that drive through the brick to the concrete column behind.
Usually four to five hours from tracing pipes to final testing. If we find old pipework in the way or a weak wall, an extra hour may be needed to reroute the waste line.