Wall position check
Marking the correct height and anchor points before any drilling

Farwaniya
Wall-hung basin installation in Rabiya starts with residents wanting a second bathroom or upgrading an existing kitchen wash point. We set height based on who uses it, carefully drill the residential wall, firmly fix the bracket and connect water and waste lines to strict local standards.
Rabiya is a quiet residential area with similar house designs, concrete walls and regularly arranged internal pipes. You typically find vertical water lines behind bathroom and kitchen walls and existing waste reaches central outlets in the interior courtyard. When choosing the basin location we pick a spot near existing pipes where waste naturally slopes to the sump or main line without needing long horizontal runs under the floor.
Rabiya sits in Farwaniya governorate as a quiet residential district known for uniform design and family homes.
We flow water from the empty basin and test drain quality and pressure to ensure existing pipes have no blockages or weak flow.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, central lines are designed to handle multiple bathrooms and kitchens in one house. Before installation we test existing drain flow by running all sources together and confirm water does not pool at any trap.
If the distance is short we run pipe along the interior wall surface. If it is long we cut narrow channels under existing tiles and lay pipes with steady fall, then reset the floor to match old tile work.
