Wall position check
Marking the correct height and anchor points before any drilling

Jahra
Wall-hung basin installation in Sulaibiya Agricultural must account for the fact that many farms and animal sheds have walls of ordinary brick or lightweight blocks. We check wall thickness, test fixing strength, run pipes from the nearby roof tank and test the waste before moving to the next farm.
Animal husbandry sheds in Sulaibiya Agricultural were built quickly with lightweight block or brick walls that do not carry heavy loads like concrete. When mounting the basin we choose a spot away from animal moisture and use short brackets instead of long ones to reduce bending stress on the wall. We pull-test the fixing hard before connecting water, because lightweight walls need more care than residential house walls.
Sulaibiya Agricultural lies in Jahra governorate and is an animal farming zone where lightweight walls are the rule.
We inspect lightweight blocks with a metal mirror before drilling to confirm there are no air gaps that weaken the anchor.
Marking the correct height and anchor points before any drilling
Fitting wall brackets rated to carry the basin weight safely
Connecting hot and cold lines with new isolation valves fitted
Setting a new trap and connecting to the waste run at the right fall
Fitting the mixer, strainer and all trim with sealed connections
Pressure check, waste flow test and full leak inspection before leaving
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but only if we anchor the bracket deep enough in a solid part of the block. We choose a spot away from voids and look at the wall from different angles to ensure uniform thickness.
We pick a spot away from the damp source and use rust-resistant anchors. After fixing we leave a tiny gap between the bracket and wall to allow air movement and reduce moisture absorption.
