Drain and supply check
Outlet position and height confirmed before the unit is placed

Mubarak Al-Kabeer
Bathtub installation in Abu Fatira begins by checking the floor and confirming the waste outlet exists and slopes towards the main sewer. We set the tub on a stable base, connect all fixtures and seal every joint with heavy-duty silicone before testing.
Modern homes in Abu Fatira were built with waste pipes hidden under tiles, which means the bathtub position is already fixed by prior construction. We check the house plans first to trace the existing waste route, and if the new tub sits elsewhere we suggest rerouting or adding a branch. Before starting work we measure from the tub outlet to the sewer and calculate the slope needed.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a modern residential zone that expanded rapidly and contains homes built to unified sewerage standards.
Water and waste are run together for at least ten minutes to inspect every joint for tightness, especially at the lower corner of the tub.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we must lift tiles and run a new waste line under the floor. This increases cost and time, but we finish with a sealed joint and sand bedding under the floor to prevent moisture.
Heavy-duty silicone needs at least twenty-four hours to cure fully, but we test the seal with a light water run after twelve hours. After full testing you can safely fill the tub.
