Frame and tray level
Frame and tray set perfectly flat so water drains fully

Jahra
A shower cabin in Jahra Industrial goes into work centres and shops with concrete floors and clear slopes. We select a spot with strong natural drainage, fix the cabin with drilling anchors and connect water and waste pipes with flexibility to absorb machinery vibration.
Jahra Industrial factories are large facilities with thick concrete floors, metal walls and complex overhead pipe lines. Changing and shower rooms typically sit beside the workshop entrance where institutional drainage is available. Before installation we survey the floor for clear fall towards the main drain or slope it if needed. Supply pipes run from the roof tank or a main line with steady pressure, and the waste must handle heavy water load from multiple workers during peak hours.
Jahra Industrial is in Jahra governorate, a zone of large factories with strong infrastructure systems and systematic drainage.
We test the cabin drain under peak load with full water flow for 30 minutes to simulate multiple worker use.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
One cabin fits one worker at a time but the drain can handle sequential use by 4 to 5 workers if the main drain is large and pipe fall is good. We recommend two cabins if a shift has more than 20 workers.
We install a pressure regulator on the main supply line before the cabin and use flexible metal pipes to absorb shock. We measure initial and final pressure with a gauge before handover.
