Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Hawalli
For villas being rebuilt or extended in Mubarak Al-Abdullah, the best time to plan a wall-hung toilet is before the plasterer arrives. We set the frames while the walls are still open, which lets the contractor build around them instead of cutting back into finished work.
Villas in the Mubarak Al-Abdullah suburb are often rebuilt or extended, and during that work bathroom walls stand bare for a short window. We fix each frame to the slab, set the drain height against the finished floor level given by the site engineer, and protect the flush opening with its cover so plaster and tile adhesive stay out. The bowl and plate are left in their boxes until the family is ready to move in.
Mubarak Al-Abdullah is a residential suburb in Hawalli governorate made up mostly of detached family villas.
On Mubarak Al-Abdullah renovation sites, frames go in before plastering, with covers left on until final fit-out.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We take the finished floor level from the site engineer or the tile thickness plan, then set the outlet against that mark rather than the bare slab.
No. The frame and concealed cistern come first. The bowl and flush plate can be chosen later, as long as they suit the frame's fixing centres.