Position and height
correct mounting height marked before any fixing begins

Capital
Washbasin installation in Abdullah Al-Salem starts by understanding the villa layout and the pipes already buried underground. We locate the nearest floor trap, run hot and cold lines from the main riser and test the waste under full pressure before final fixing.
In Abdullah Al-Salem villas, the utility room is often far from main bathrooms, meaning long waste runs that need consistent fall. We check the floor and available gradient to ensure water does not collect in the pipe. If the fall is poor in places, we raise the basin or use larger diameter pipework to speed the flow.
Abdullah Al-Salem lies in Kuwait governorate, an established villa neighbourhood where original ground levels can make widening holes or rerouting pipes below ground more difficult.
We run every supply and waste joint with cold water first, then hot water to check for thermal expansion movement.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We carefully open the tile around the trap and record its exact position before laying the new waste line. Only damaged tiles are removed, then original tiles reset or matching pieces laid where possible.
If the line is long and lacks sufficient fall, water pools and odours form. We test the gradient with a string along the new run to ensure steady slope keeps water flowing.
