Position and height
correct mounting height marked before any fixing begins

Mubarak Al-Kabeer
Washbasin installation in Abu Hasaniya starts by understanding sea-facing villa architecture with deep foundations and complex drainage systems. We run hot and cold supply from roof or central tanks, connect waste to the nearest floor trap or side run and test every joint before leaving.
Abu Hasaniya seafront villas have multiple main and secondary bathrooms with deep concrete foundations below sea level. We measure drainage falls precisely because any fall error means water sits trapped in pipes hidden under marble floors. Wall-hung basins allow flexible outlet height, enabling proper drainage even in bathrooms distant from the main waste line.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate, a luxury family villa zone on the waterfront where foundations run deep and facilities are individual.
Every waste pipe is scanned with a blockage detector before handover to confirm no debris sits in the line.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before basin installation, we test the waste under high flow for five minutes and check for any moisture beneath the marble. If moisture appears, we open the floor, identify the leak and re-lay the pipe with better fall before reinstalling.
Both are possible depending on basin location and required pressure, but we first check water quality in each tank and diameter of existing pipes. The central tank usually provides steadier pressure but may need longer pipe runs.
