Position and height
correct mounting height marked before any fixing begins

Mubarak Al-Kabeer
Washbasin installation in Sabhan Industrial differs from residential areas because warehouses and factories handle heavy water discharge and sometimes have metal floors. We locate the basin near an existing industrial drain. We run supply pipes from a nearby point, connect waste to the main drainage system, and pressure-test before use.
Sabhan factories and warehouses have thick concrete floors and established drainage channels designed for oil seepage and water runoff. When fitting a worker wash station, we choose a spot near the existing channel to minimize new waste pipe length. We verify the main channel fall and connect the basin with a standard trap that catches debris and blocks odours. We test full-flow discharge to ensure water does not pool around the basin.
Sabhan Industrial is in Mubarak Al-Kabeer governorate, a factory and warehouse zone requiring robust drainage for heavy water loads.
Full-flow discharge is checked for two minutes to confirm no water pooling or sediment buildup occurs.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we first confirm the channel is not live to direct production lines. We fit a robust trap on the basin to separate debris and light oils before water reaches the main channel.
We mount the basin on a fixed metal stand and run the waste pipe above the floor along the wall to the existing channel. We secure the pipe with metal clamps and shield the route to prevent trips.
