Position and height
correct mounting height marked before any fixing begins

Mubarak Al-Kabeer
Washbasin installation in Funaitees requires understanding dense residential building layouts and shared waste lines under streets. We position the basin within reach of the nearest trap, run supply with adequate pipe diameter and test pressure and flow before handover.
Funaitees apartment blocks sit close together on narrow streets with main waste lines under pavements at uniform depth. Each building has multiple floor traps on flat concrete, and placing a basin too far from a trap means the pipe loses required fall. We choose a location near the trap or raise the basin outlet to ensure proper flow without stagnation.
Funaitees sits in Mubarak Al-Kabeer governorate, an urban residential district of multi-storey apartment blocks with shared public sewerage services.
Basin drainage is tested by filling and emptying the bowl twice in succession to confirm no flow delay occurs.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, any digging under pavements requires permission from Mubarak Al-Kabeer municipality. We help you file the request or work through existing channels where possible to avoid new excavation.
We can install a small separate trap beside the basin and run it to the main waste line under the pavement nearby. This allows location flexibility and ensures proper drainage.
