Position and height
correct mounting height marked before any fixing begins

Capital
Washbasin installation in Jaber Al-Ahmad City relies on the standardised building plans of the new residential development. We use pre-designed vertical risers and coordinate with horizontal pipes already in the walls and test each joint before wall closure.
New buildings in Jaber Al-Ahmad City have standardised pipework pre-planned inside walls, which eases installation but demands precision in measurement. Floor traps sit in standard positions in each apartment and waste lines already have regular fall from design. We ensure the new basin connections match existing pipe diameters and do not impede water flow in other lines.
Jaber Al-Ahmad City is a modern residential zone in Kuwait governorate where new apartments and villas are built to uniform pipe and drainage standards.
We pressure-test all supply joints for at least thirty seconds to confirm the integrity of pipes concealed behind walls.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but it requires new lines run from the planned vertical riser or from existing horizontal pipes in walls. We open the wall carefully, coordinate with uniform measurements and re-close it, then test every joint before handover.
We verify the vertical riser and floor trap have sufficient flow to ensure both basins do not cause backup or sluggish drainage. If the riser is adequate, we replicate the connections using the same specifications, diameters and fall.
