Position and height
correct mounting height marked before any fixing begins

Capital
Fitting a washbasin in Rai may be in a shop near The Avenues Mall or an office near IKEA in an active commercial zone. We draw hot and cold water from the building's main vertical riser through visible or concealed pipes as designed, connect waste to the complex's main waste line, air-gap test every joint, and ensure the trap location does not obstruct customer flow.
Rai's commercial complexes are modern buildings with centralised water and waste systems featuring vertical risers and large horizontal lines under the slab or above suspended ceilings. Each retail or office unit has standardised connection points for cold and hot water, making basin installation simple without drilling bearing walls. Basin waste drains into a shared line either under floor tiles or behind an external wall, serving multiple units on the same floor. When positioning the basin, we consider customer and staff access and avoid high-traffic zones. Pressure and waste testing together is essential because centralised systems may drop pressure during peak hours or spike unexpectedly.
Rai is in Kuwait City near The Avenues Mall and IKEA, a concentrated commercial zone with high-density buildings and heavy public facilities.
We monitor water pressure on a gauge during peak usage in the complex because pressure drops can affect mixer flow rate.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, standardised connection points in Rai units are designed for this. We branch the pipes at the marked points and run new lines to the basin location, all without needing central maintenance approval as long as we avoid the main risers.
We run new pipes along the suspended ceiling or under floor tiles as the interior design allows. This keeps pipes visible or fully concealed as you prefer, covering the long distance without cutting extra walls.
