Position and height
correct mounting height marked before any fixing begins

Capital
Fitting a washbasin in Surra near Surra Co-op demands precision in handling luxury villas with high architectural standards. We choose the basin position to match bathroom design, extend covered copper supply pipes from the tank, test waste and every joint under full pressure before handover.
Upscale villas in Surra near Fourth Ring Road are known for refined interior design and multiple bathrooms. Each villa has its own roof tank and private drain systems, and copper pipes are installed within painted walls or behind marble cladding. Before final fitting, we confirm the floor trap position suits the overall décor and does not disrupt decorative tile layers, and where needed we use concealed drain outlets or hidden pipes under raised floors.
Surra lies in Kuwait Governorate and is among the most prestigious residential districts, with large villas and advanced amenities.
We test copper pipe joints by running hot water for 10 minutes to ensure no pinhole leaks develop under pressure.
correct mounting height marked before any fixing begins
drain slope set and trap fitted with a proper water seal
hot and cold supply connected through new isolation valves
sanitary silicone applied at the basin edge to block water ingress
mixer seated and cartridge aligned to stop dripping at rest
water run and every joint checked before wall or cabinet is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We run pipes in dedicated channels before marble cladding is installed, and confirm placement with the contractor to avoid crossing horizontal backing plates. After installation, no pipes remain visible.
We extend separate hot and cold lines from the roof tank to each basin, with an isolation valve for each line. Waste from both basins combines at one or two traps depending on layout, and shared drain reduces the need for new floor openings.
