Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Capital
Western toilet installation in Qibla starts by levelling the pan precisely to the bathroom floor. We connect waste and supply lines, fit the cistern, test the flush and seal, then hand over.
In older Qibla commercial and residential buildings, bathrooms are often narrow with vertical waste pipes in the wall, and the pan sits close to the vertical stack to avoid a long horizontal run. We check the stack for plumb and clear any blockages, then set a thick cement bed under the pan to reach the correct height and spread the load. The cistern hangs on the wall or sits on a metal bracket depending on the bathroom space available.
Qibla lies in Kuwait governorate near the Gulf, a mixed-use area of offices and older houses requiring regular maintenance of fixtures.
After setting the pan, we fill the cistern and test the ball valve and flush ten times because old pipework reveals leaks under repeated use.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the tile under the current pan is strong, we pour a new cement bed over it and set the new pan on top. But thin or cracked tile must be removed first before laying the new base.
We test the old pipe with water from top and bottom before installing the new pan to confirm it is sound. If water flows freely, it serves the new installation and no digging is needed.
